Slow work day for me today. It was lots of coordination as the kitchen cabinets were delivered today and the floor sanding commenced (not by me). I thought sanding and coating the floor would not be too difficult but got convinced by 3 other professionals in the construction business to hire someone to do it. Serena could tell you more on that at a later date.

Also a representative from our local oil company came by to explain all about the oil and hot water heat system.

Although both bathrooms have been gutted, a temporary toilet was installed in bath 1. And boy did that come in handy today, and I’m sure it will be useful all week. And it only cost $1.50 for a new wax ring. Thanks Paul.
temporary toilet